hash
stringlengths 32
32
| doc_id
stringlengths 5
12
| section
stringlengths 4
1.47k
| content
stringlengths 0
6.67M
|
---|---|---|---|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.2.1 3.84 Mcps TDD Option
|
Void
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.2.2 1.28 Mcps TDD Option
|
For the parameters specified in Table7.8.1 the BLER should not exceed the piece-wise linear BLER curve specified in Table 7.8.2.
Table 7.8.1: DCH parameters in birth-death propagation conditions (1.28 Mcps TDD Option)
Parameters
Unit
Test 1
Test 2
Number of DPCHo
8
2
Scrambling code and basic midamble code number*
0
0
DPCH Channelization Codes*
C(k,Q)
C(i,16)
i=1,2
C(i,16)
i=1…8
DPCHo Channelization Codes*
C(k,Q)
C(i,16)
3≤ i ≤10
C(i,16)
9≤ i ≤10
DB
-10
-10
Ioc
dBm/1.28MHz
-60
Information Data Rate
Kbps
12.2
64
*Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code.
Table 7.8.2: Performance requirements in birth-death propagation conditions (1.28 Mcps TDD Option)
Test Number
[dB]
BLER
1
7.3
10-2
2
6.5
10-2
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.2.3 7.68 Mcps TDD Option
|
void
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.3 Test purpose
|
To verify the ability of the receiver to receive a predefined test signal, representing a moving propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a BLER not exceeding a specified value.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.4 Method of test
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.4.1 Initial conditions
|
Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1. Connect the SS and an AWGN noise source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.17.
2. Set up a call according to the Generic call setup procedure TS34.108 [3] sub clause 7.3.2.
3. Set the test parameters as specified in table 7.8.1.
4. Enter the UE into loopback test mode and start the loopback test.
5. Setup fading simulator as moving propagation condition, which is described in clause D.2.3.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.4.2 Procedure
|
1. Measure BLER of DCH.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.5 Test Requirements
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.5.1 3.84 Mcps option
|
Void.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.5.2 1.28 Mcps option
|
For the parameters specified in table 7.8.3 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.8.4.
Table 7.8.3: DCH parameters in birth-death propagation conditions
Parameters
Unit
Test 1
Test 2
Number of DPCHo
8
2
Scrambling code and basic midamble code number*
0
0
DPCH Channelization Codes*
C(k,Q)
C(i,16)
i=1,2
C(i,16)
i=1…8
DPCHo Channelization Codes*
C(k,Q)
C(i,16)
3≤ i ≤10
C(i,16)
9≤ i ≤10
DB
-10
-10
Ioc
dBm/1.28MHz
-60
Information Data Rate
Kbps
12.2
64
*Note: Refer to TS 25.223 for definition of channelization codes, scrambling code and basic midamble code.
Table 7.8.4: DCH requirements in birth-death propagation conditions
Test Number
[dB]
BLER
1
8.0
10-2
2
7.2
10-2
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
7.8.5.3 7.68 Mcps option
|
Void.
8 Requirements for Support of RRM
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.1 General
|
Void.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2 Idle Mode Tasks
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.1 RF Cell Selection Scenario
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.1.1 Introduction
|
After a UE has switched on and a PLMN has been selected, the Cell selection process takes place, as described in TS 25.304. This process allows the UE to select a suitable cell where to camp on in order to access available services. In this process the UE can use stored information (Stored information cell selection) or not (Initial cell selection).
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2 Cell Re-Selection
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1 Scenario 1: Cell re-selection to intra frequency TDD cell
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.1 Definition and applicability
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.1.1 3,84 Mcps TDD Option
|
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.1.2 1,28 Mcps TDD Option
|
The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.
This test is applicable to 1,28 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.1.3 7,68 Mcps TDD Option
|
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.2 Minimum requirement
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.2.1 3,84 Mcps TDD Option
|
The cell re-selection delay shall be less than 8 s when the DRX cycle length is 1,28 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to table 4.1 in clause 4.2.2.7 in [2].
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.1.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.2.2 1,28 Mcps TDD Option
|
The cell re-selection delay shall be less than 8 s when the DRX cycle length is 1,28 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:
TevaluateNTDD: A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to table 4.1A in clause 4.2 in [2].
TSI: Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in 25.331 for a UTRAN cell (ms). 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.1.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.2.3 7,68 Mcps TDD Option
|
The cell re-selection delay shall be less than 8 s when the DRX cycle length is 1,28 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to table 4.1B in clause 4.2.2.7.3 in [2].
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.1.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.3 Test purpose
|
This test is to verify the requirement for the cell re-selection delay in the single carrier case
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4 Method of test
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.1 3,84 Mcps TDD Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.1.1 Initial conditions
|
This scenario implies the presence of 1 carrier and 6 cells as given in table 8.2.2.1.1 and table 8.2.2.1.2. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.1.1: General test parameters for Cell Re-selection to intra-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
15
T2
s
15
Table 8.2.2.1.2: Cell re-selection single carrier to intra-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
0
0
0
0
5
5
5
5
10
10
10
10
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
9
7
9
7
7
9
7
9
-1
-1
-1
-1
PCCPCH RSCP
dBm
-64
-66
-66
-64
-74
-74
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0
C1, C5:0; C1, C6:0
C2, C1: 0; C2, C3:0; C2,C4:0
C2, C5: 0; C2, C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5: 0; C3, C6:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
15
15
15
15
20
20
20
20
25
25
25
25
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
PCCPCH RSCP
dBm
-74
-74
-74
-74
-74
-74
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
dBm/3,84 MHz
-70
Propagation Condition
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.1.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) [TBD] times.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.2 1,28 Mcps TDD Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.2.1 Initial conditions
|
This scenario implies the presence of 1 carrier and 6 cells as given in table 8.2.2.1.1A and 8.2.2.1.2A.
Table 8.2.2.1.1A: General test parameters for Cell Re-selection to intra-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-103
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑– Persistence value
0..1
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
15
T2
s
15
Table 8.2.2.1.2A: Cell re-selection to intra-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
OCNS_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
dB
10
7
10
7
7
10
7
10
-1
-1
-1
-1
PCCPCH RSCP
dBm
-63
-66
-66
-63
-74
-74
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0
C1, C5:0; C1,C6:0
C2, C1: 0; C2, C3:0; C2,C4:0
C2, C5: 0; C2, C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5: 0; C3, C6:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
OCNS_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
dB
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
PCCPCH RSCP
dBm
-74
-74
-74
-74
-74
-74
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0 C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
dBm/ 1.28 MHz
-70
Propagation Condition
AWGN
Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.2.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for SYNCH-UL sequence in the UpPTS for sending for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps b)-g) until the confidence level according to annex F.6.2 is achieved.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.3 7,68 Mcps TDD Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.3.1 Initial conditions
|
This scenario implies the presence of 1 carrier and 6 cells as given in table 8.2.2.1.1B and table 8.2.2.1.2B. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.1.1B: General test parameters for Cell Re-selection to intra-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1.28
The value shall be used for all cells in the test.
DRX cycle length
s
1.28
The value shall be used for all cells in the test.
T1
s
15
T2
s
15
Table 8.2.2.1.2B: Cell re-selection to intra-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
0
0
0
0
5
5
5
5
10
10
10
10
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
9
7
9
7
7
9
7
9
-1
-1
-1
-1
PCCPCH RSCP
dBm
-64
-66
-66
-64
-74
-74
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0
C1, C5:0; C1,C6:0
C2, C1: 0; C2, C3:0; C2,C4:0
C2, C5: 0; C2,C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5: 0; C3,C6:0
Qhyst 1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 1
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
15
15
15
15
20
20
20
20
25
25
25
25
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
PCCPCH RSCP
dBm
-74
-74
-74
-74
-74
-74
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0 C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
dBm/7,68 MHz
-70
Propagation Condition
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.4.3.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) until the confidence level according to annex F.6.2 is achieved.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.5 Test Requirements
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.5.1 3,84 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.5.2 1,28 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.1.5.3 7,68 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than 90% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2 Scenario 2: Cell re-selection to inter-frequency TDD cell
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.1 Definition and applicability
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.1.1 3,84 Mcps Option
|
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.1.2 1,28 Mcps Option
|
The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send the SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on cell 2.
This test is applicable to 1,28 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.1.3 7,68 Mcps Option
|
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell, and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.2 Minimum requirement
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.2.1 3,84 Mcps Option
|
The cell re-selection delay shall be less than 8 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The rate of correct cell reselections observed during repeated tests shall be at least 90%.NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to table 4.1 in clause 4.2.2.7 in [2].
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.2.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.2.2 1,28 Mcps Option
|
The cell re-selection delay shall be less than 8 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:
TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate NTDD of 6.4s according to table 4.1A in clause 4.2 in [2].
TSI Time required for receiving all the relevant system information data according to the reception procedure and the RRC procedure delay of system information blocks defined in 25.331 for a UTRAN cell (ms). 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.2.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.2.3 7,68 Mcps Option
|
The cell re-selection delay shall be less than 8 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to table 4.1B in clause 4.2.2.7.3 in [2].
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.2.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.3 Test purpose
|
This test is to verify the requirement for the cell re-selection delay in the multi carrier case.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4 Method of test
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.1 3,84 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.1.1 Initial conditions
|
This scenario implies the presence of 2 carriers and 6 cells as given in table 8.2.2.2.1 and table 8.2.2.2.2. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.2.1: General test parameters for Cell Re-selection to inter-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
30
T2
s
15
Table 8.2.2.2.2: Cell re-selection to inter-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 2
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
dB
10
7
10
7
7
10
7
10
-1
-1
-1
-1
PCCPCH RSCP
dBm
-63
-66
-66
-63
-74
-74
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0
C2, C1: 0; C2, C3:0; C2,C4:0C2, C5:0; C2, C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5:0; C3, C6:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel
Channel 2
Channel
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
dB
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
PCCPCH RSCP
dBm
-74
-74
-74
-74
-74
-74
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0
C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
dBm/3,84 MHz
-70
Propagation Condition
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.1.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) [TBD] times.
NOTE: T1 is initially 30 s to allow enough time for the UE to search for cells as it has no prior knowledge of these.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.2 1,28 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.2.1 Initial conditions
|
This scenario implies the presence of 2 carriers and 6 cells as given in table 8.2.2.2.1A and table 8.2.2.2.2A. For this test purpose the broadcast repetition period of the target cell shall be 1.28s. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.2.1A: General test parameters for Cell Re-selection to inter-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-103
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
30
T2
s
15
Table 8.2.2.2.2A: Cell re-selection to inter-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 2
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
OCNS_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
dB
10
4
10
4
4
10
4
10
-1
-1
-1
-1
PCCPCH RSCP
dBm
-63
-69
-69
-63
-74
-74
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0
C2, C1: 0; C2, C3:0; C2,C4:0C2, C5:0; C2, C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5:0; C3, C6:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
DWPTS
0
DWPTS
0
DWPTS
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 2
Channel 2
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
0
0
0
OCNS_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
dB
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
-1
PCCPCH RSCP
dBm
-74
-74
-74
-74
-74
-74
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0
C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
dBm/1,28 MHz
-70
Propagation Condition
AWGN
* Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.2.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps b)-g) until the confidence level according to annex F.6.2 is achieved.
NOTE: T1 is initially 30 s to allow enough time for the UE to search for cells as it has no prior knowledge of these.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.3 7,68 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.3.1 Initial conditions
|
This scenario implies the presence of 2 carriers and 6 cells as given in table 8.2.2.2.1B and table 8.2.2.2.2B. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.2.1B: General test parameters for Cell Re-selection to intra-frequency TDD cell
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5, Cell6
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1.28
The value shall be used for all cells in the test.
DRX cycle length
s
1.28
The value shall be used for all cells in the test.
T1
s
30
T2
s
15
Table 8.2.2.2.2B: Cell re-selection to intra-frequency TDD cell
Parameter
Unit
Cell 1
Cell 2
Cell 3
Timeslot Number
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 2
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
0
0
0
0
5
5
5
5
10
10
10
10
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
6
0
6
0
0
6
0
6
-3
-3
-3
-3
PCCPCH RSCP
dBm
-67
-73
-73
-67
-76
-76
Qoffset1s,n
dB
C1, C2: 0; C1, C3:0; C1,C4:0 C1, C5:0; C1, C6:0
C2, C1: 0; C2, C3:0; C2,C4:0 C2, C5:0; C2, C6:0
C3, C1: 0; C3, C2:0; C3,C4:0
C3, C5:0; C3, C6:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
Cell 4
Cell 5
Cell 6
Timeslot
0
8
0
8
0
8
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
T1
T2
UTRA RF Channel Number
Channel 1
Channel 2
Channel 2
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
15
15
15
15
20
20
20
20
25
25
25
25
PICH_Ec/Ior
dB
-3
-3
-3
-3
-3
-3
OCNS
dB
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
-3
-3
-3
-3
-3
-3
-3
-3
-3
-3
-3
-3
PCCPCH RSCP
dBm
-76
-76
-76
-76
-76
-76
Qoffset1s,n
dB
C4, C1: 0; C4, C2:0; C4,C3:0
C4, C5:0; C4, C6:0
C5, C1: 0; C5, C2:0; C5,C3:0
C5, C4:0; C5, C6:0
C6, C1: 0; C6, C2:0; C6,C3:0
C6, C4:0; C6, C5:0
Qhyst1s
dB
0
0
0
Treselection
s
0
0
0
Sintrasearch
dB
not sent
not sent
not sent
Sintersearch
dB
not sent
not sent
not sent
dBm/7,68 MHz
-70
Propagation Condition
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.4.3.2 Procedure
|
a) The SS activates cell 1-6 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) until the confidence level according to annex F.6.2 is achieved.
NOTE: T1 is initially 30 s to allow enough time for the UE to search for cells as it has no prior knowledge of these.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.5 Test Requirements
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.5.1 3,84 Mcps Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 8 s.
3) In step g), the UE shall respond on cell 2 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.5.2 1,28 Mcps Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 8 s.
3) In step g), the UE shall respond on cell 2 within 8 s.
For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.2.5.3 7,68 Mcps Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 8 s.
3) In step g), the UE shall respond on cell 2 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than 90% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
8.2.2.2A Scenario 2A: 3,84 Mcps TDD cell re-selection for 1,28 Mcps TDD UE
[FFS]
8.2.2.2B Scenario 2B: 1,28 Mcps TDD cell re-selection for 3,84 Mcps TDD UE
FFS
8.2.2.2C Scenario 2C: 3,84 Mcps TDD cell re-selection for 7,68 Mcps TDD UE
8.2.2.2C.1 Definition and applicability
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test applies to to UEs supporting both 3.84 Mcps TDD and 7.68Mcps TDD.
8.2.2.2C.2 Minimum requirement
The cell re-selection delay shall be less than 8 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The rate of correct cell reselections observed during repeated tests shall be at least 90%.
NOTE:
TevaluateTDD + TSI
where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1B in section 4.2.
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.2.
8.2.2.2C.3 Test purpose
This test is to verify the requirement for the cell re-selection delay in the 7.68Mcps TDD to 3.84 Mcps TDD case.
8.2.2.2C.4 Method of test
8.2.2.2C.4.1 Initial conditions
This scenario implies the presence of 1 higher chip rate (7.68 Mcps TDD OPTION) and 1 high chip rate (3.84 Mcps TDD OPTION)) cell as given in Table 8.2.2.2C.1 and 8.2.2.2C.1.
Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.2C.1: General test parameters for TDD higher chip rate (7.68 Mcps) to TDD high chip rate (3.84 Mcps) cell re-selection
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
7.68 Mcps TDD OPTION cell
Neighbour cell
Cell2
3.84 Mcps TDD OPTION cell
Final condition
Active cell
Cell2
3.84 Mcps TDD OPTION cell
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
S
1,28
The value shall be used for all cells in the test.
DRX cycle length
S
1,28
The value shall be used for all cells in the test.
T1
S
30
T2
S
15
Table 8.2.2.2C.2: Test parameters for TDD higher chip rate (7.68 Mcps) to TDD high chip rate (3.84 Mcps) cell re-selection
Parameter
Unit
Cell 1
Cell 2
Timeslot Number
0
8
0
8
T1
T2
T 1
T 2
T1
T2
T 1
T 2
UTRA RF Channel Number
Channel 1
Channel 2
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
0
0
0
0
5
5
5
5
PICH_Ec/Ior
dB
-3
-3
-3
-3
OCNS_Ec/Ior
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
10
7
10
7
7
10
7
10
PCCPCH_RSCP
dBm
-63
-66
-66
-63
Qoffset1s,n
dB
C1, C2: 0
C2, C1: 0
Qhyst1s
dB
0
0
Treselection
s
0
0
Sintersearch
dB
not sent
not sent
-70 dBm/7.68 MHz
-70 dBm/3.84 MHz
Propagation Condition
AWGN
8.2.2.2C.4.2 Procedure
a) The SS activates cell 1 and 2 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) [TBD] times.
NOTE: T1 is initially 30 s to allow enough time for the UE to search for cells as it has no prior knowledge of these.
8.2.2.2C.5 Test Requirements
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 8 s.
3) In step g), the UE shall respond on cell 2 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
8.2.2.2D Scenario 2D: 7,68 Mcps TDD cell re-selection for 3,84 Mcps TDD UE
8.2.2.2D.1 Definition and applicability
The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
The requirements and this test applies to to UEs supporting both 3.84 Mcps TDD and 7.68Mcps TDD.
8.2.2.2D.2 Minimum requirement
The cell re-selection delay shall be less than 8 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The rate of correct cell reselections observed during repeated tests shall be at least 90%.
NOTE:
TevaluateTDD + TSI
where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to Table 4.1B in section 4.2.
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.2.
8.2.2.2D.3 Test purpose
This test is to verify the requirement for the cell re-selection delay in the 3.84Mcps TDD to 7.68 Mcps TDD case.
8.2.2.2D.4 Method of test
8.2.2.2D.4.1 Initial conditions
This scenario implies the presence of one 3.84 Mcps TDD serving cell, and one 7.68 Mcps TDD cell to be re-selected. The UE is requested to monitor neighbouring cells on one 3.84Mcps TDD carrier and one 7.68 Mcps TDD carrier. Test parameters are given in Table 8.2.2.2D.1and 8.2.2.2D.2.
Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.2D.1: General test parameters for 3.84 Mcps /7.68 Mcps TDD cell re-selection
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell 1
3.84 Mcps TDD OPTION cell
Neighbour cell
Cell 2
7.68 Mcps TDD OPTION cell
Final condition
Active cell
Cell 2
7.68 Mcps TDD OPTION cell
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Qrxlevmin
dBm
-102
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
S
1,28
The value shall be used for all cells in the test.
DRX cycle length
S
1,28
The value shall be used for all cells in the test.
T1
S
30
T2
S
15
Table 8.2.2.2D.2: Cell 1 specific test parameters for 3.84 Mcps TDD/7.68 Mcps TDD cell re-selection
Parameter
Unit
Cell 1
Cell 2
Timeslot Number
0
8
0
8
T1
T2
T 1
T 2
T1
T2
T 1
T 2
UTRA RF Channel Number
Channel 1
Channel 2
PCCPCH_Ec/Ior
dB
-3
-3
-3
-3
SCH_Ec/Ior
dB
-9
-9
-9
-9
-9
-9
-9
-9
SCH_toffset
0
0
0
0
5
5
5
5
PICH_Ec/Ior
dB
-3
-3
-3
-3
OCNS_Ec/Ior
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
-3,12
dB
10
7
10
7
7
10
7
10
PCCPCH_RSCP
dBm
-63
-66
-66
-63
Qoffset1s,n
dB
C1, C2: 0
C2, C1: 0
Qhyst1s
dB
0
0
Treselection
s
0
0
Sintersearch
dB
not sent
not sent
-70 dBm/3.84 MHz
-70 dBm/7.68 MHz
Propagation Condition
AWGN
8.2.2.2D.4.2 Procedure
a) The SS activates cell 1 and 2 with T1 defined parameters and monitors cell 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) [TBD] times.
NOTE: T1 is initially 30 s to allow enough time for the UE to search for cells as it has no prior knowledge of these.
8.2.2.2D.5 Test Requirements
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 8 s.
3) In step g), the UE shall respond on cell 2 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3 Scenario 3: TDD/FDD Cell re-selection
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.1 Definition and applicability
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.1.1 3,84 Mcps Option
|
The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
This test is for the case where the UE camps on a 3,84 Mcps TDD cell and reselects to an FDD cell.
The requirements and this test apply to UEs supporting both 3,84 Mcps TDD and FDD.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.1.2 1,28 Mcps Option
|
The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on cell 2.
This test is for the case where the UE camps on a 1,28 Mcps TDD cell and reselects to an FDD cell.
The requirements and this test apply to UEs supporting both 1,28 Mcps TDD and FDD.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.1.3 7,68 Mcps Option
|
The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send preambles on the PRACH for sending the RRC CONNECTION REQUEST message to perform a Location Registration on the new cell.
This test is for the case where the UE camps on a 7,68 Mcps TDD cell and reselects to an FDD cell.
The requirements and this test apply to UEs supporting both 7,68 Mcps TDD and FDD.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.2 Minimum requirements
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.2.1 3,84 Mcps TDD Option
|
The cell re-selection delay shall be less than 8 s when the DRX cycle length is 1,28 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateFDD + TSI, where:
TevaluateFDD See TS 25.123 [2] table 4.1 in clause 4.2.2.
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.3.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.2.2 1,28 Mcps TDD Option
|
The minimum requirement for the cell re-selection delay is less than 8 s with a DRX cycle length of 1280ms.
This shall be verified in more than 90% of the cases with a confidence level of 95%.
The normative reference for this requirement is TS 25.123 [2]clauses 4.2.2 and A4.2.3.
NOTE: The cell re-selection delay can be expressed as: TevaluateFDD + TSI, where:
TevaluateFDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a TevaluateFDD of 6.4s according to table F2.4.1.A in Annex F clause F.2.4.
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7,68 s, allow 8 s in the test case.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.2.3 7,68 Mcps TDD Option
|
The cell re-selection delay shall be less than 8 s when the DRX cycle length is 1,28 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
NOTE:
The cell re-selection delay can be expressed as: TevaluateFDD + TSI, where:
TevaluateFDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s. See TS 25.123 [2] table 4.1 in clause 4.2.2.
TSI Maximum repetition rate of relevant system info blocks that needs to be received by the UE to camp on a cell. 1280 ms is assumed in this test case.
This gives a total of 7.68 s, allow 8s in the test case.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.3.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.3 Test purpose
|
The test purpose is to verify the requirement for the cell re-selection.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4 Method of test
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.1 3,84 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.1.1 Initial conditions
|
This scenario implies the presence of 1 TDD and 1 FDD cell as given in table 8.2.2.3.4.1 and table 8.2.2.3.4.2. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.3.4.1: General test parameters for the TDD/FDD cell re-selection
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
TDD cell
Neighbour cells
Cell2
FDD cell
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
30
T2
s
15
Table 8.2.2.3.4.2: TDD/FDD cell re-selection
Parameter
Unit
Cell 1
Cell 2
Timeslot Number
0
8
n.a
n.a.
T1
T2
T 1
T 2
T 1
T 2
UTRA RF Channel Number
Channel 1
Channel 2
CPICH_Ec/Ior
dB
n.a.
n.a.
-10
-10
PCCPCH_Ec/Ior
dB
-3
-3
-12
-12
SCH_Ec/Ior
dB
-9
-9
-9
-9
-12
-12
SCH_toffset
0
0
0
0
n.a.
n.a.
PICH_Ec/Ior
dB
-3
-3
-15
-15
OCNS_Ec/Ior
dB
-3,12
-3,12
-3,12
-3,12
-0,941
-0,941
dB
3
-2
3
-2
-2
3
dBm/3,84 MHz
-70
CPICH_RSCP
dBm
n.a.
n.a.
-82
-77
PCCPCH_RSCP
dBm
-70
-75
n.a.
n.a.
Cell_selection and reselectionquality _measure
CPICH_RSCP
CPICH_RSCP
Qrxlevmin
dBm
-102
-115
Qoffset1s,n
dB
C1, C2: -12
C2, C1: +12
Qhyst1s
dB
0
0
Treselection
s
0
0
Sintersearch
dB
not sent
not sent
Propagation Condition
AWGN
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.1.2 Procedure
|
a) The SS activates cell 1 and cell 2 with T1 defined parameters and monitors them for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 30 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) [TBD] times.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.2 1,28 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.2.1 Initial Conditions
|
This test is to verify the requirement for the 1,28 Mcps TDD OPTION/FDD cell re-selection delay reported in clause 4.2. in [2]
This scenario implies the presence 1.28Mps TDD serving cell, and 1 FDD cell to be selected. The UE is requested to monitor neighbouring cells on 1 1.28Mcps TDD carrier and 1 FDD carrier. Test parameters are given in table 8.2.2.3.4.1A and table 8.2.2.3.4.2A.
Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.3.4.1A: General test parameters for the TDD/FDD cell re-selection
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
1,28 Mcps TDD OPTION cell
Neighbour cells
Cell2
FDD cell
Final condition
Active cell
Cell2
FDD cell
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
TSI
s
1,28
The value shall be used for all cells in the test.
DRX cycle length
s
1,28
The value shall be used for all cells in the test.
T1
s
30
T2
s
15
Table 8.2.2.3.4.2A: Test parameters for the 1,28 Mcps TDD OPTION/FDD cell re-selection
Parameter
Unit
Cell 1
Cell 2
Timeslot Number
0
DwPts
n.a.
T1
T2
T 1
T 2
T1
T2
UTRA RF Channel Number
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-12
-12
DwPCH_Ec/Ior
dB
0
0
n.a.
CPICH_Ec/Ior
dB
n.a.
n.a.
-10
-10
SCH_Ec/Ior
dB
n.a.
n.a.
-12
-12
PICH_Ec/Ior
dB
-15
-15
OCNS_Ec/Ior
dB
-3
-3
-0,941
-0,941
dB
8
2
8
2
-3
-3
-70 dBm/1.28MHz
-70 dBm/3.84MHz
PCCPCH_RSCP
dBm
-65
-71
n.a.
n.a.
CPICH_RSCP
n.a.
-83
-77
Cell_selection_and_reselection quality _measure
CPICH_RSCP
CPICH_RSCP
Qrxlevmin
dBm
-103
-115
Qoffset1s,n
dB
C1, C2: -12
C2, C1: +12
Qhyst1s
dB
0
0
Treselection
s
0
0
Sintersearch
dB
not sent
Propagation Condition
AWGN
* Note: In the case of multi-frequency cell, the UTRA RF Channel Number is the primary frequency’s channel number.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.2.2 Procedure
|
a) The SS activates cell 1 and cell 2 with T1 defined parameters and monitors them for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 30 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for SYNCH-UL sequence in the UpPTS for sending RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps b)-g) until the confidence level according to annex F.6.2 is achieved.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.3 7,68 Mcps Option
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.3.1 Initial conditions
|
This scenario implies the presence of 1 TDD and 1 FDD cell as given in table 8.2.2.3.4.1B and table 8.2.2.3.4.2B. Cell 1 and cell 2 shall belong to different Location Areas.
Table 8.2.2.3.4.1B: General test parameters for the TDD/FDD cell re-selection
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
TDD cell
Neighbour cells
Cell2
FDD cell
Final condition
Active cell
Cell2
HCS
Not used
UE_TXPWR_MAX_RACH
dBm
21
The value shall be used for all cells in the test.
Access Service Class (ASC#0)
‑ Persistence value
1
Selected so that no additional delay is caused by the random access procedure. The value shall be used for all cells in the test.
DRX cycle length
s
1.28
The value shall be used for all cells in the test.
T1
s
30
During T1 cell 1 better ranked than cell 2
T2
s
15
During T2 cell 2 better ranked than cell 1
Table 8.2.2.3.4.2B: TDD/FDD cell re-selection
Parameter
Unit
Cell 1
Cell 2
Timeslot Number
0
8
n.a
n.a.
T1
T2
T 1
T 2
T 1
T 2
UTRA RF Channel Number
Channel 1
Channel 2
CPICH_Ec/Ior
dB
n.a.
n.a.
-10
-10
PCCPCH_Ec/Ior
dB
-3
-3
-12
-12
SCH_Ec/Ior
dB
-9
-9
-9
-9
-12
-12
SCH_toffset
0
0
0
0
n.a.
n.a.
PICH_Ec/Ior
dB
-3
-3
-15
-15
OCNS_EcIor
dB
-3,12
-3,12
-3,12
-3,12
-0,941
-0,941
dB
3
-2
3
-2
-2
3
-70 dBm/7.68 MHz
-70 dBm/3.84 MHz
CPICH_RSCP
dBm
n.a.
n.a.
-82
-77
PCCPCH_RSCP
dBm
-70
-75
n.a.
n.a.
Cell_selection_and reselection_quality _measure
CPICH_RSCP
CPICH_RSCP
Qrxlevmin
dBm
-102
-115
Qoffset1s,n
dB
C1, C2: -12
C2, C1: +12
Qhyst1s
dB
0
0
Treselection
s
0
0
Propagation Condition
AWGN
AWGN
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.4.3.2 Procedure
|
a) The SS activates cell 1 and cell 2 with T1 defined parameters and monitors them for RRC CONNECTION REQUEST messages from the UE.
b) The UE is switched on.
c) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
d) After 30 s, the parameters are changed as described for T2.
e) The SS waits for RRC CONNECTION REQUEST messages from the UE.
f) After another 15 s, the parameters are changed as described for T1.
g) The SS waits for RRC CONNECTION REQUEST messages from the UE.
h) Repeat steps d) to g) until the confidence level according to annex F.6.2 is achieved.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.5 Test requirements
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.5.1 3,84 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.5.2 1,28 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.3.5.3 7,68 Mcps TDD Option
|
1) In step c), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 8 s.
3) In step g), the UE shall respond on cell 1 within 8 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more than 90% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and the explanation of how the Minimum Requirement has been relaxed by the Test Tolerance is given in clause F.4.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4 Scenario 4: inter RAT cell re-selection
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.1 Definition and applicability
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.1.1 3,84 Mcps Option
|
The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send LOCATION UPDATING REQUEST message to perform a Location update to the new cell.
This test is for the case where the UE camps on a 3,84 Mcps TDD cell and reselects to a GSM cell.
The requirements and this test apply to UEs supporting both 3,84 Mcps TDD and GSM.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.1.2 1,28 Mcps Option
|
The cell re-selection delay is defined as the time from the beginning of time period T2, to the moment when the UE camps on Cell 2, and starts to send LOCATION UPDATING REQUEST message to perform a Location update.
This test is for the case where the UE camps on a 1,28 Mcps TDD cell and reselects to a GSM cell.
The requirements and this test apply to UEs supporting both 1,28 Mcps TDD and GSM.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.1.3 7,68 Mcps Option
|
The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send LOCATION UPDATING REQUEST message to perform a Location update to the new cell.
This test is for the case where the UE camps on a 7,68 Mcps TDD cell and reselects to a GSM cell.
The requirements and this test apply to UEs supporting both 7,68 Mcps TDD and GSM.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.2 Minimum requirement
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.2.1 3,84 Mcps Option
|
The cell re-selection delay shall be less than 26 s + TBCCH, where TBCCH is the maximum time allowed to read BCCH data in the GSM cell.
NOTE: The cell re-selection delay can be expressed as:
4 * TmeasureGSM + TBCCH
where:
TmeasureGSM Specified in Table 4.1 in sub clause 4.2.2.7.1 in [2].
TBCCH Equal to 1.9 s, i.e. the maximum time allowed to read BCCH data when synchronised to a BCCH carrier from a GSM cell (specified in TS 45.005).
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.4
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.2.2 1,28 Mcps Option
|
The cell re-selection delay shall be less than 8 s + TBCCH where TBCCH is the maximum time allowed to read BCCH data from GSM cell.
The rate of correct cell reselections observed during repeated tests shall be at least 90%.
NOTE: The cell re-selection delay can be expressed as: Max(3*TmeasureNTDD , Tmeasure GSM +1DRX)+ TBCCH, where:
TmeasureTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureNTDD of 1.28s according to Table 4.1A in [2].
TmeasureGSM A DRX cycle length of 1280ms is assumed for this test case, this leads to a TmeasureGSM of 6.4s according to Table 4.1A in [2].
DRX cycle length 1.28s is assumed, see Table A.4.1A in [2].
TBCCH Maximum time allowed to read BCCH data from GSM cell in TS 45.005.
According to[20], the maximum time allowed to read the BCCH data, when being synchronized to a BCCH carrier, is 1.9 s.
This gives a total of 7.68s +TBCCH, thus allow 8s +TBCCH.
The normative reference for this requirement is TS 25.123 [2] clauses 4.2.2 and A.4.2.4
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.2.3 7,68 Mcps Option
|
The cell re-selection delay shall be less than 26 s + TBCCH, where TBCCH is the maximum time allowed to read BCCH data in the GSM cell [21].
The rate of correct cell reselections observed during repeated tests shall be at least 90%.
NOTE: The cell re-selection delay can be expressed as:
4 * TmeasureGSM + TBCCH
where:
TmeasureGSM Specified in Table 4.1B in sub clause 4.2.2.7.3 in [2].
TBCCH Equal to 1.9 s, i.e. the maximum time allowed to read BCCH data when synchronised to a BCCH carrier from a GSM cell [21].
This gives a total of 25.6 s + TBCCH, allow 26 s + TBCCH in the test case.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.3 Test purpose
|
This test verifies the UE meets the minimum requirement for the case where the UE camps on a TDD cell and reselects to a GSM cell.
|
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.4 Method of Test
| |
40bd05ebf1e9d686c3dc55dd3e817398
|
34.122
|
8.2.2.4.4.1 3,84 Mcps Option
|
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.