Spaces:
Runtime error
Runtime error
# IDOT Statewide Planning & Research Funds Guidelines | |
## Overview | |
- IDOT receives approximately $25 million annually in Federal Highway Administration State Planning and Research Funds | |
- Funds are used to establish a cooperative, continuous, and comprehensive framework for transportation planning and research | |
- FY2025 Program Guidance document outlines requirements for grant applications | |
## Eligible Activities | |
- Planning studies | |
- Data purchase, collection, and/or analysis | |
- Program development activities | |
- Performance management activities | |
- Coordination/outreach activities | |
## Ineligible Activities | |
- SPR funds are NOT for use on: | |
- Preliminary engineering | |
- Design | |
- Right-of-way | |
- Construction | |
- Maintenance projects | |
- Air and water transportation modes are generally not eligible (with some exceptions) | |
## Project Requirements | |
- All proposed projects must relate to the State's Long Range Transportation Plan or modal plans | |
- IDOT evaluates projects based on their ability to further study or implement the Long Range Transportation Plan | |
- Projects can support internal agency staff, consultant assistance, and data/equipment purchases | |
- Procurement must follow federal and state rules | |
## Eligible Entities | |
- Government entities (IDOT, other state agencies, planning organizations, local jurisdictions) | |
- Joint applications are encouraged for multi-sponsor projects | |
- Private entities or non-profits are eligible if they have a public sponsor (municipality, park district, county, etc.) | |
## Funding Information | |
- Competitive process for a portion of the funds | |
- Projects should align with transportation planning goals | |
- Multi-modal transportation focus (highways, active transportation, rail, transit) | |
- Partial funding may be available for air/water transportation if related to goods movement or surface transportation | |
## Application Process | |
- Formal application required (Appendix A of the guidance document) | |
- IDOT and FHWA determine eligibility of project proposals | |
- Projects evaluated based on alignment with Long Range Transportation Plan | |
## Relevance to Unity Fleet's "The Link" EV Charging Network | |
- The project aligns with planning and research for transportation infrastructure | |
- Focus on electric vehicle infrastructure supports state transportation goals | |
- Public-private partnership structure appears eligible with proper sponsorship | |
- Data collection and analysis components would be eligible activities | |
- Performance management aspects align with eligible activities | |